A Civil Earthmoving Company with a working fleet of over 100 pieces of equipment.
This civil earthmoving company has been around for over 40 years. Not only that, but they are locally owned and operated.
In their time they have completed countless projects across Queensland, Cape York Peninsula and the Torres Strait Islands.
They have provided their services to both private and commercial developers, as well as both Local and State Government. Their enviable reputation has also seen them to be sought after by the aquaculture, and thoroughbred racing industries.
They have been involved with a wide range of different project types over the years, and as a result have built up a level of vast experience that many aspire to, and only a few achieve.
Their equipment works predominately in Far North Queensland, and has to deal with some of the toughest temperatures that Australia has to offer.
Yalanji Environmental Solutions has worked with this earthmoving company to resolve a key issue they were having with some of their equipment, that was costing them both time and money.
During warmer months of business, the owner Barry had 2 Cat scrapers working in a very remote, and hot, part of Far North Queensland.
The problem at that time is that the operators were having to shut down the engines a few times during the daily shift due to overheating.
This was increasing downtime, reducing productivity, and simply increasing the overall cost of operations.
The challenge was to reclaim those lost productive man hours, in a way that would not be detrimental to the engine, equipment, or the operator.
We suggested to Barry to drain the cooling systems on the two machines and fill both with the Engine Flush Premix, and run for a period of 30 days.
Then drain the Engine Flush Premix, and refill with our ENVIROLife Heavy Duty Platinum Coolant Premix.
Once running on ENVIROLife Heavy Duty Platinum Coolant Premix, the plan was to run the two Cat scrapers for several months, and then compare the results with the previous circumstances to see how our products had performed.
This was a real-world test, and conducted, and assessed entirely by Barry, and his Cat scraper’s operators.
When we caught up with Barry few months later, after the trial period, he informed us that neither machine had experienced overheating, and they had not had to shutdown during the daily shifts, not even once.
Barry has benefitted from an obvious increase in productivity due to the increased operational hours the two Cat scrapers have seen.
This in turn has reduced the costs associated with downtime, as well as increased the profit associated with being more productive in a set period of time.
No more shutdowns during the shift due to overheating.
With no more shutdowns during the shift, Barry’s Civil Earthmoving Company is able to complete more work during the same shift length, achieving more operational / man hours in the same period of time.
No more wasted downtime. More work accomplished in the same time frame. Dramatic drop in engine temperature, allowing more productivity per day. Cost of our product was cheaper, lasted longer, and performed better.
Call us today to find out more
contact usis proudly powered by Powered by WordPress.com.